ARSN verifies that all nuclear and radiological facilities in Niger comply with regulatory requirements. Our inspections guarantee the safety of workers, the public and the environment.
ARSN conducts three types of inspections depending on the situation: planned to verify regular compliance, unannounced for real-life control, and reactive following an incident.
Scheduled in advance in the annual inspection plan approved by the General Directorate. The operator is informed of the schedule at the beginning of the year. Allow for systematic and in-depth assessment.
Carried out without notice to verify actual operating conditions. An essential tool for effective regulatory control. The inspector goes directly to the facility.
Triggered immediately following a reported incident, complaint, information on a potential non-compliance or radiological emergency. Rapid ARSN response.
Here is how an ARSN planned inspection takes place, from notification to the final report.
ARSN sends a notification letter specifying the date, areas to be inspected and documents to prepare.
The operator prepares the requested documents: registers, procedures, measurement results, training records, source inventory.
The inspector presents the objectives and scope of the inspection. The operator designates their escort (RPO or manager).
Premises visit, equipment verification, document review, radiological measurements, staff interviews.
The inspector presents preliminary observations. The operator can provide immediate clarification on points raised.
ARSN transmits the official report with conclusions, identified non-conformities and prescriptions. The operator has a deadline to respond.
The ARSN inspection checklist covers all regulatory requirements applicable to each type of facility.
Depending on the inspector's findings, ARSN can issue different types of conclusions and measures.
The facility complies with all applicable regulatory requirements. ARSN concludes favourably and prescribes no corrective measures.
Low-severity deviations are identified. ARSN prescribes corrective actions to be carried out within a fixed deadline, generally 30 to 90 days.
Serious or repeated deviations are found. ARSN may issue a formal notice, suspend the authorisation or require immediate cessation of activity.
Here are the documents and conditions that every operator must be able to present at any time during an ARSN inspection.
Contact the inspection service of the Radiation Protection Directorate for any question about your inspection programme or follow-up actions.